Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04CM04237

Parcel: 12703040B


Addresses:

5602 E SPEEDWAY BL

Inspection Status: Partial Approval

Inspection History: MECHANICAL - HOODS

Date Description Inspector Results Comments
06/07/2006 MECHANICAL - HOODS Partial Approval IVRS - Inspection :*
CHECKED FIRE WRAP ON TOP OF HOOD & ON GREASE DUCT. OK TO INSTALL HOOD & BLOWER.
06/05/2006 MECHANICAL - HOODS Partial Approval IVRS - Inspection :*
FIRE WRAP OK
TOP OF HOOD MUST MEET MIN. 18" CLEARANCE ALSO, IF USING FIRE WRAP ON TOP OF HOOD, PROVIDE INSTALL INSTRUCTIONS.
05/30/2006 MECHANICAL - HOODS Partial Approval IVRS - Inspection :*
REAR WALL OF TYPE 1 HOOD, COMBUSTIBLE IMC 506.3.6
1. OK TO WRAP EX. DUCT ON SITE.
2. WHERE ARE DIMENSIONS FOR EXH. DUCT? APP. PLAN HAS NO DIMENSIONS OR DRAWING.
3. IF DIMENSIONS ARE CORRECT, OK TO START WRAPPING
CONTINUES UP INTO CURB.
12/30/2005 MECHANICAL - HOODS Partial Approval IVRS - Inspection :*FIRE WRAP ON GREASE DUCT OK
OK TO SET EXHAUST FANS. EXTEND FANS 2" ABOVE EXISTING EVAP COOLERS
EXTEND WATER HEATER VENT 3' ABOVE EVAP. COOLER
EXTEND SEWER VENTS 2' ABOVE EVAP COOLER IF WITHIN 10'
12/23/2005 MECHANICAL - HOODS Partial Approval IVRS - Inspection :*WATER HEATER REQUIRES 4" VENT PIPE. WHY WAS 6" USED. LARGER VENT CAN CAUSE DRAFTING PROBLEMS & CONDENSATION INSIDE VENT PIPE.
NEED TO SEE FIRE WRAP ON GREASE DUCTS.