Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04CM04230

Parcel: 141015060

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T04CM04230

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
11/17/2004 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*/ 1) NOTE: LOCATION OF 2" BRANCH UNDER BEARING WALL. COVER WITH SAND TOP/BOTTOM OF LINE, WILL CHECK AT SLAB INSPECTION
2) REMOVE H20 LINE
11/15/2004 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) ROUGH PLUMBING NOT PER APPROVED PLANS YOU MUST BUILD EXACTLY PER PLAN USING IRC PLUMBING
2) ABS TO PVC TRANSITION GLUE NOT ALLOWED. SEE IRC 3003.2 ITEM 5 AND 3003.3.6