Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 07/22/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO REFEE ASSESSED AT THIS TIME 2) EXTERIOR SIDING INCORRECTLY INSTALLED 3) RE-INSTALL SINK PLUMBING INTO WALL AT PORCH 4) INSTALL ROOF JACKS ON PLUMBING VENTS ON ROOF 5) COMPLETE NAILING OF SHEATHING AT OVER HANG INTO TRUSSES 6) SET NAILS/STAPLES FLUSH WITH OSB 7) CHECK ROOF NAILING-SOME SECTIONS NOT NAILED OFF 8) MAINTAIN MINIMUM 1/8" GAP BETWEEN OSB SHEATHING 9) MUST INSTALL WINDOW BRACING EACH CORNER BOTH WAYS AT MAXIMUM 25' OF RUN 10) STOPPED INSPECTION-ITEMS INCOMPLETE |
|
| 07/20/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED APPROVED TRUSS DRAWINGS 2) CROSS BRACE 'X' FIRST AND THIRD TRUSS EACH END 3) COMPLETE PORCH SHEATHING AND EXTERIOR SIDING 4) SIDING MUST OVERLAP ONTO STEM WALL CONCRETE MINIMUM 1 1/2" 5) INSTALL BANG PLATES EXTERIOR BOTTOM PLATES AT PLUMBING CUTS 6) INSTALL A35'S PORCH LEDGER TO STUDS 7) MOVE SINK DRAIN BACK INTO WALL 8) NEED 10' LADDER TO INSPECT ROOF 9) STOPPED INSPECTION |