Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/25/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HOT SIDE OF LAVATORY TO BE COMPLETELY COVERED 2) CAULK WATER CLOSET BASE 3) SEAL EXTERIOR WALL PENETRATION AT HOSE BIB 4) INSTALL VACUUM BREAKER AT HOSE BIB |
|
| 10/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) UNABLE TO LOCATE INSPECTION HISTORY 2) NO OPEN FRONT SEAT ON WATER CLOSET 3) HOT SIDE OF LAVATORY TO BE INSULATED COMPLETELY 4) SEAL EXTERIOR WALL PENETRATION AT GAS |