Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 12/06/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) 2-NAILS PENETRATING KITCHEN EXHAUST DUCT, REPLACE DUCT |
|
| 12/03/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) INSTALL BLOCK AT GARAGE BETWEEN COMBUSTIBLE VENTS 2) COMPLETE STUCCO MESH FRONT BAY WINDOW 3) SEAL ALL PENETRATIONS EXTERIOR 4) SECURE 4-WAY SWITCH BOX AT ENTRY BOTH SIDES 5) NAIL PROTECT PEX UNDER MASTER BED WINDOWS 6) NAIL PROTECT MASTER BATH VENT STACK AT TOP PLATE AND BEHIND TUB |