Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 01/06/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INCOMPLETE SET OF PLANS 2) ITEMS NOT CORRECTED 3) STOPPED INSPECTION |
|
| 01/05/2005 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) NOTE: BOTH GIRDER TRUSSES USE 16D NAILS INTO CARRYING MEMBER, LONG GIRDER HAS 3,843 POUND LOAD ? CHECK AT INTERMEDIATE INSPECTION |
|
| 01/03/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : There is no plan or job inspection card on site.| 925*/1)NO PLANS OR PERMIT ON SITE. YOU MUST PAY A RE INSPECTION FEE PRIOR TO NEXT INSPECTION. |
|
| 12/30/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 12/29/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NAIL PROTECT PLUMBING FROM EXTERIOR 2) OVERSPAN RIGHT SIDE OF WINDOW SOUTHEAST 3) WIND BRACE SOUTH EAST CORNER TO SHORT 4) CLIP SOUTH EAST CORNER NEXT TO S.G.D. MISSING NAILS 5) BLOCK VENT OPENINGS THROUGH ROOF 6) COMPLY WITH DETAIL 4SD4 7) PROVIDE COMPLETE SET OF PLANS SD6 PG MISSING AND SD3 8) SEE LAST INSPECTION 9) STOPPED INSPECTION |
|
| 12/28/2004 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CLIP GABLE END TRUSSES AT ENDS PER 1/SD3 2) DBL 2 X POST MISSING UNDER WEST GIRDER 3) NO TRUSS DRAWINGS ON SITE 4) OSB PANEL ENDS ARE NOT SUPPORTED BY STRUCTURE 5) ROOF PANEL DO NOT ? 6) HIGH STAPLES THROUGHOUT 7) STOPPED INSPECTION |