Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2006 | ENGINEERING - FINAL | Approved | ||
| 10/30/2006 | ENGINEERING - FINAL | Partial Approval | TEMP C/O FOR ENG. ONLY PERMANENT C/O NOT TO BE GIVEN UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL GRADING IS APPROVED | |
| 09/27/2006 | ENGINEERING - FINAL | Denied | 1) INSTALL DOUBLE GATES AT TRASH ENCLOSURE PER PLAN. ENCLOSURE IS 9' WIDE FROM BOLLARD TO BOLLARD, IT MUST BE 10'. 2) INSTALL BIKE PARKING PER PLAN. 3) COMPLETE LANDSCAPING. 4) HC PARKING SPACE IS 7' 7", IT MUST BE 8' 6" WIDE PER YOUR APPROVED PLAN. VAN ACCESSIBLE LOADING SPACE MUST BE 9' WIDE. 5) PROVIDE DETAIL ON POOL, POOL ENCLOSURE, AND GAZEBO AREA FROM THE ENGINEER OF RECORD (SEPERATE PERMIT?, WHY IS ST SHOWN ON PLANS? ...) OR COMPLETE POOL AREA PER APPROVED PLAN. 6) PROVIDE CLARIFICATION ON NOTE #29 ON SITE PLAN (ENTRY CANOPY AND WALL). 7) CLEAN UP CONSTRUCTION MATERIALS AND DEBRIS. 8) SEPARATE ANY CONSTRUCTION ACTIVITY FROM OCCUPIED BLDGS. |
|
| 05/03/2005 | ENGINEERING - FINAL | Prior to Final Inspectn |