Inspection History Details
Inspection Status: Denied
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2005 | ENGINEERING - FINAL | Denied | NO SITE WORK HAS BEEN COMPLETED. 1. COMPLETE ALL SITE WORK AS SHOWN ON THE SITE PLAN PAGE C1. 2. PROVIDE ALL PAVEMENT STRIPING, CONCRETE WHEEL STOPS, HANDICAP PARKING WITH SIGN AND PEDESTRIAN WALKWAYS. 3. PROVIDE ALL PERIMETER IMPROVEMENTS INCLUDING CURBS, CURB RETURNS, LANDCAPING PLANTERS/BUFFERS, SCREEN WALLS AND SIDEWALK SCUPPER. 4. PROVIDE REFUSE CAN ENCLOSURE WITH 6' SCREEN WALL. 5. PROVIDE A NEW HANDICAP ACCESS RAMP PER ADA REQUIREMENTS AT SOUTHEAST CORNER OF BUILDING.. 6. PROVIDE HANDICAP RAMPS AT NEW CURB RETURNS ON SPEEDWAY. 7. PROVIDE APPROVED WASTE OIL AND ANTIFREEZE STORAGE THAT PREVENTS CONTACT WITH STORMWATER AND HAS SECONDARY SPILL CONTAINMENT. 8. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 9. REMOVE ROLL-OFF CONTAINER BLOCKING GARAGE ACCESS. |