Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/21/2007 | PLUMBING - FINAL | Not ready for Inspection | CONDENSATE TO LAV HAS BEEN CAPPED OFF TO CORRECT PLUMBING PROBLEM AT P-TRAP PIPE CONDENSATE TO APPROVED LOCATION 218-07 |
|
| 03/20/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* REMOVE ROCKS FROM TOP OF PIPING USE CLEAN BACKFILL CORRECT 6" DEEP UNAPPROVED P-TRAP |
|
| 03/14/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 10' OF EXPOSED YARD WATER 1. EXPOSE ALL YARD WATER PIPING AND CALL FOR 03040 INSPECTION 2. SUPPORT BELOW GRADE PIPING W/CLEAN FILL DIRT 3. INSTALL TRACER WIRE PER STATE STATUTE |
|
| 02/09/2007 | PLUMBING - FINAL | Cancelled | CANCELLED PER JUAN | |
| 02/06/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/16/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* LOCKED SEE NOTES FROM PREVIOUS INSP. HAVE UNAPPROVED INSP APPROVED CORRECT T&P |
|
| 08/09/2006 | PLUMBING - FINAL | Cancelled | CANCELLED BY PHONE CALL | |
| 08/09/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - YOU HAVE NOT COMPLETED ANY OF THE NECESSARY CORRECTIONS FROM THE INSPECTION ON 8/7/06 - FOR THAT REASON A REINSPECTION FEE HAS BEEN ASSESSED. - THE FEE MUST BE PAID WITHIN 5 DAYS. - AFTER 5 DAYS A HOLD WILL BE PLACED ON ANY FURTHER INSPECTIONS. - NO FINAL INSPECTIONS CAN BE SCHEDULED OR PERFORMED IF THERE ARE ANY UNPAID REINSPECTION FEES. ALSO, PLANS ON SITE DO NOT REFLECT WORK HAVE APPROVED PLANS FOR THIS JOB ONSITE AT ALL TIMES. |
|
| 08/07/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. EXPOSE YARD WATER LINE AND CALL FOR INSPECTION. 2. WATER SHALL BE ON FOR INSPECTIONS 3. LOCATE AND EXPOSE EXTERIOR SEWER CLEAN OUTS SHALL BE TO GRADE. 4. LAV P-TRAP NOT PROPERLY INSTALLED 5. T&P RELIEF FROM WH SHALL TERMINATE OUTSIDE, GRAVITY DRAIN. 6. DW & HOSE NOT PROPERLY INSTALLED 7. PROVIDE CLEANOUT PLUGS LISTED TO RECEIVE SCREW FROM COVER. |
|
| 06/28/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*1) DWV WATER TEST IS OK. 2) OVERHEAD WATER DISTRIBUTION IS OK. 3) OK TO DRY WALL. | |
| 06/09/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/22/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) ABS SEWER FROM CONNECTION AT MAIN( CUT IN FITTING, NO SADDLE TAP) TO BLDG OK. WATER TEST OK OK TO COVER CONTRACTOR TO SHADE PIPE WITH 6" OF CLEAN FILL. |