Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO APPROVED PLAN ON SITE. |
|
| 06/28/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/13/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) PLAN CALLS FOR 1 1/2" PVC YARD WATER-1 1/4" INSTALLED. PLEASE NOTE: YARDWATER TO BE SHADED WITH CLEAN-FILL 2) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP 3) NO ISOMETRIC DRAWINGS FOR WATER PIPING OR GAS 4) MISSING CLOSET FLANGE 5) ABS VENT SYSTEM NOT INSTALLED PER PLAN 6) ALLOW HEAD PIPING TO BE INSTALLED TO TABLE 3-1 AND APPROPRIATE INSTALLATION STANDARD 7) VENT FITTINGS LESS THEN 6" ABOVE OVERFLOW OF FIXTURE TO BE DRAINAGE TYPE |
|
| 06/09/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 60 PSI AIR TEST FOR H20 SYSTEM OK 2) REPLACE NO HUB COUPLING ON 3" VENT STACK WITH APPROVED COUPLING 3) PROVIDE WATER OR AIR TEST ON DWV SYSTEM THRU ROOF |
|
| 06/06/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MAX TRAP ARM FOR LAVATORY ON WEST WALL SHALL BE 1 1/2" 2) SHALL PROVIDE ISULATORS FOR ALL COPPER PENETRATIONS THRU METAL STUDS 3) SHALL SEPERATE COPPER WATER LINES FROM EACH OTHER AND PROVIDE 10 MIL TAPE WHERE COPPER TOUCHES DISSIMULAR MATERIAL 4) RE-TEST DWV SYSTEM 5) SHALL PROVIDE MINIMUM OF 50 POUNDS OF AIR PRESSURE ON WATER DISTRIBUTION |
|
| 05/30/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY FOR INSPECTION |