Permit: T04CM03841

Parcel: 10321671B

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T04CM03841

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/14/2004 PLUMBING - FINAL Approved IVRS - Inspection :*1) PLUMBING FINAL OK. 2) OK FOR C OF O PENDING ANY OTHER INSPECTION.
12/10/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*1)WHERE IS ISOLATION VALVE AT ANSUL? LOOP 2)NOT NO GRATES ON FLOOR SINK. 3)CONTRACTOR WILL REMOVE ALL MACHINE SCREWS FOR C.P. CLEAN-OUT COVERS, REMOVE RAISED SQ HEAD PLUGS AND INSTALL COUNTER SUNK TAPPED CLEAN OUT PLUGS...THEN CUT THE SCREW TO LENGTH AND LEAVE COVER AND SCREW NEXT TO CLEAN OUT. 4)GAS NOT INSTALLED PER PLAN 5)CERTIFICATIONS ON BACKFLOW DEVICES NOT AVAILABLE 6)HOOK-UP ALL EQUIPMENT MAKE ALL CONNECTIONS. INSTALL ALL VALVES 7)CALL IN ALL REQUIRED INSPECTIONS
12/08/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/1)PLAN APPROVED IN ERROR. P-5 PLUMBING FIXTURE SCHEDULE BACK FLOW PREVENTER WATTS 9BD NOT APPROVED DEVICE. INSTALL APPROVED, TESTABLE ASSEMBLY 2)OK TO COVER INTERCEPTOR. CONTRACTOR TO INFILL CORE HOLE FOR VENT 3)ALL INDIRECT WASTE PIPING SUBJECT TO 94UPC 4)GAS PRESSURE TEST OK - OK TO INSTALL ANSAL? VALVE
12/07/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/1)MAKE ALL CONNECTIONS, HOOK UP ALL EQUIPMENT 2)ALL INDIRECT WASTE PIPING IS GOVERNED BY 94 UPC 3)HAVE PLUMBER
12/06/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/ 1) NOTE: CLEANOUT PLUGS UNDER A CP COVER NEED TO BE COUNTER ? TAPED PLUGS WITH MACHINE SCREW. WOOD SCREWS OR SHEETROCK SCREWS ON A RAISED SQUARE HEAD TEST PLUG-NOT ACCEPTED