Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM03838
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/09/2005 | ENGINEERING - FINAL | Approved | Contractor completed all items on punch-list and supplied letter from engineer. | |
11/28/2005 | ENGINEERING - FINAL | Partial Approval | STOCKING ONLY, NO PUBLIC ACCESS. Contractor needs to finish punch-list, dated 11-23-05. Temp only good for 90 days. Contractor will need to pay reinspection fee. Contractor will need to supply letter from engineer in regards to catch boxes. |
|
11/23/2005 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Complete all site work. 2- Clean all streets and parking area. 3- Provide safe access for public. 4- Separate all contruction activity and material from public access. 5- Repair cracked curb on eastside of building. 6- Complete striping for public access. 7- Pick up all construction trash. 8- Repair truncated domes on H.C. ramp eastside of building. 9- Remove covers from catch boxes around site. 10- Install all wheel stops in parking area. 11- install drain cover in trash encloser area. 12- Expose catch box on rightside of doorway in froont of building to ensure installed per detail. |