Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T04CM03838
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED ALL BACKFLOW CERTS - ALL CORRECTIONS HAVE BEEN MADE |
|
12/01/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) OK FOR TEMP C OF O PER STEVE LONG'S APPROVAL 2) 1 ADDITIONAL DBL CHECK ASSEMBLY TO BE INSTALLED AT POTABLE WATER DISTRIBUTION AREA TO SEPERATE BAR GUNS (2) FROM SODA FOUNTAINS (2) 3) PROVIDE CERTIFICATION PAPERWORK FOR ALL BACKFLOW ASSEMBLERS 4) SUPPORT HOT AND COLD PIPING AT WATER HEATER CONNECTIONS 5) CORRECT SOLDIER LEAK AT SOFTNER 6) SEPERATE RINSE AND WASH COMPARTMENTS ON 3 COMP SINK FROM SANITIZE COMPARTMENT 7) SEPERATE DISH WASHER, FROM HAND DRAIN 8) PROVIDE CLEANOUTS AND WYE BRANCH (LONG-RADIUS) FITTINGS ON INDIRECT DRAIN PIPING A SAN T ON IT'S BACK IS NOT AN EXCEPTABLE INSTALLATION 9) DRAINAGE PIPING MUST BE THE SAME SIZE AS THE OUTLET 10) UV PROTECTION REQUIRED FOR EXPOSED PLASTIC PIPING 11) REMOVE TEMP CLEANOUT PLUGS AND INSTALL TAPPED CLEANOUT PLUGS WITH MACHINE SCREW 7) |
|
11/28/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*BACKFLOW PROTECTION REQUIRED FOR CARBONATORS, COFFE & TEA BREWING EQUIPTMENT, AND ICE MAKER. | |
11/23/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* TEST AND PIPING TO NEW HAND SINK ?? DISHWASHING AREA OK TO COVER WILL NEED APPROVED PLAN FOR CHANGE. |