Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2006 | ENGINEERING - FINAL | Approved | ||
| 10/04/2006 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY, CALL FOR RE-INSPECTION. | |
| 09/25/2006 | ENGINEERING - FINAL | Denied | 1) PROVIDE SPLASH BLOCKS AT DOWN SPOUTS PER PLAN. 2) PROVIDE CLARIFICATION (MORE DETAI) ADDRESSING THE STORM WATER DRAINAGE FROM THE ARCHITECT OF RECORD. THE APPROVED PLANS CALL FOR POSITIVE DRAINAGE AWAY FROM THE BLDG @ A 1% SLOPE FOR A DISTANCE OF 10'. EXISTING CONDITIONS DO NOT MEET APPROVED PLANS AND WILL CAUSE PONDING. |