| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2005 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* | |
| 08/28/2005 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) OK TO ENERGIZE PANELS A, B, X AND Y 2) MANUFACTURERS HOLDOWN TO BE EFFECTIVE |
|
| 08/25/2005 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) FINISH MAKE UP AND DEVICES 2) WAITING ON HOLDOWN FOR MAIN |
|
| 08/22/2005 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) PANEL "E" MANUFACTURES HOLD DOWN NEEDED 2) DEVICES 8' AND DOWN TO BE INSTALLED FOR PANELS TO BE ENERGIZED WITH INSPECTION 3) OK PANELS: E, A, B, Y, Z TO LUGS ONLY |
|
| 08/18/2005 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) OK PANEL "Y" TO MAIN LUGS 2) OK TO TRANSFORMER T-1 TO LUGS 3) OK BONDING CT CAN AND "MDP" 4) VERIFY CONDUCTOR SIZE PANEL "Z" 5) PANEL "C" TO HAVE A MAIN BREAKER 6) PLANS CALL FOR CV GROUND EQUIPMENT CONDUCTORS |
|
| 08/17/2005 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection :* 1) OK TEMP POWER FOR TEST TO MAIN BREAKERS |