Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*CORRECTION MADE 2) LANDSCAPE BACKFLOW PREVENTERS CERTIFICATIONS TURNED IN. |
| 01/04/2005 |
PLUMBING - FINAL |
|
Partial Approval |
IVRS - Inspection :*/UNITS A, B, C OK FOR FINAL. UNIT D REQUIRES 03052 COMPLETION AND CERTIDICATION OF LANDSCAPING BACK FLOW DEVICE. |
| 12/30/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*NOT READY - COMPLETE ALL PLUMBING WORK AND THEN CALL IN FOR INSPECTION. |
| 12/23/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/GAS PIPING FROM STUB ON EXTERIOR OF BUILDING TO FURNACE & WATER HEATER ONLY OK. NEED ENTIRE GAS SYSTEM SYSTEM TESTED BACK TO METER. PROVIDE BONDING OF BUILDING GAS PIPING. HAVE ADDRESS & UNIT #'S POSTED 1)PROVIDE GAS VALVES & FLEXES ON SITE INSTALLED 2)PROVIDE CORRECT CLEANOUTS AT KITCHEN SINKS. 3)PROVIDE CORRECT DRAINAGE FITTINGS AT UPSTAIRS LAV. 4)MAKE WATER TIGHT TUBS AT WALLS 5)PROVIDE CORRECT COPPER X PVC TRANSITION AT WATER SERVICE ENTRANCE 6)PROVIDE PROOF OF BACKFLOW PROTECTION AT LANDSCAPING H2O SUPPLY |