Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T04CM03735
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK. ARMAFLEX OK OK TO COVER ALL AREAS. | |
05/12/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) WILL REQUIRE LETTER ALLOWING ARMAFLEX 2) ARMA FLEX TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS, AND IN A WORKMANSHIP MANNER. | |
05/11/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) GANZ PLUMBING ON SITE 2) USE APPROVED STRAPS 3) INSULATE PER SCHEDULE OR PROVIDE LETTER ACCEPTING ARMAFLEX. ARMAFLEX TO BE INSTALLED IN A WORKMANSHIP LIKE MANNER 4) ABS WATER TEST OK 5) COPPER OK WITH CORRECTIONS TO INSULATION |
|
05/05/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE HAVE LICENSED PLUMBER ON SITE AT TIME OF NEXT INSPECTION. 2) HAVE HIM REVIEW GENERAL NOTES ON P-1 SPECIALLY NUMBERS 5,8,16 AND ENERGY NOTE #2. 3) PLEASE READ THE NOTES FROM 050205 AND COMPLY WITH ALL OF THEM. |
|
05/02/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) IT IS IMPORTANT THAT THE PLUMBER FOLLOW THE PLAN. 2) REVIEW 1S-5 94 UPC AND TABLE 3-1 94 UPC HANGERS AND SUPPORTS. NO PROVISION MADE FOR HOT INSULATION. 3) PROVIDE SHUT OFF AND UNION AT TRAP PRIMERS. 4) WATER LINE MAY NOT PASS OVER ELECTRIC SERVICE PANEL. INSPECTION STOPPED. | |
03/09/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) REVISED PLAN ON SITE. 2) BRIDGING NOT PERMITTED-MUST BE LAID ON A FIRM BED. BRANCH PIPING OVER FIVE FEET FROM MAIN REQUIRES FULL SIZE CLEAN-OUT-CLEAN-OUTS REQUIRE CLEARANCE IN FRONT OF THE CLEAN-OUT. HORIZONTAL VENTING BELOW FLOOD RIM RESTRICTED TO STRUCTURAL CONDITIONS. |