Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T04CM03701
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/20/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
09/15/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
09/10/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/1)NOT READY FOR INSPECTION PLEASE READ OVER DETAILED LIST. NO TEST ON GAS LINE AT THIS TIME 2)NO WATER TEST ON NEW WASTE LINES & HAVE YOUR PLUMBER INSTALL TO PLAN. PLEASE SEE PLAN FOR PROPER SIZE OF WASTE & VENTS 3)APPROVED PLAN ON JOB WASTE LINE INSTALLED NOT TO CODE. PLEASE PROVIDE APPROVED DRAINAGE FITTING WITH APPROVED SWEEP. SEE 94 CODE FOR WASHER STAUG? PIPE-CO EACH ANCHER PIPE WITH Z HOLE STRAPS. COMPLETE WATER PIPE TO WASHER BOX. REMOVE FLEX SUPPLY FROM INSIDE WALL TO HANG PIPE THIS MAY NOT BE A COMPLETE LIST |
|
08/31/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED 1)WATER HEATER TEMPERATURE & PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT. VENT TO HAVE ROOF FLASHING. GOAL? PIPE ONTRS? INTO BUILDING 2)PROVIDE BONDING OF BUILDING GAS PIPING 3)WATER HEATER HAS BEEN RELOCATED AND THERE IS ALOT OF PLUMBING AND OTHER TRADES WORK AT THIS LOCATION THAT IS SONE WITHOUT PLANS, PERMITS AND INSPECTIONS PLEASE PROVIDE CITY APPROVED PLANS, AND PERMITS FOR ALL YOUR ADDITION WORK AND THEN CALL FOR INSPECTION |
|
08/30/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NO ONE HOME |
|
08/25/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/GAS IS ON AT TIME OF INSPECTION. METER WAS RECLOATED APP 15' FROM WHAT IS NOW A ROOM ADDITION TO OUTSIDE THE PORCH. 1) PROVIDE 10 PSI MINIMUM TEST AT TIME OF INSPECTION. VENT FROM WATER HEATER TO BE APPROVED NATURAL? 2)WHERE INROWS? ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED 3)WATER HEATER TEMPURATURE PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETTION OF APPROAL ON SITE SIGNED BY CITY WITH APPROVED INSTALLATION 4) ALL GAS PIPING ABOVE GRADE TO BE 6" MINIUMUM ABOVE FINES? AND GRADE 5) AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES 6)PROVIDE BONDING OF BUILDING GAS PIPING 7)ALL PIPING TO BE SUPPORTED AT CORRECT INTERVALS WITH APPEOVED DEVICES 8) ALL FITTINGS TO BE APPROVED TYPE. NO THROAP? PROTECTORS |