Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T04CM03676
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/15/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :*/OK FINAL | |
10/12/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : 1) INSTA HOT TO HAVE DISCONNECTING MEANS. 2) BOXES MORE THAN 1/4" FROM BOX TO SURFACE IN NON COMBUSTIBLES TO HAVE APPROVED EXTENDER RING. 3) WHY IS PLANS CALLING FOR A 110V ? 30 AMP INSTA HOT AND? HAVE A 2P30A BREAKER WITH UNIT LABEL AS 110/120V |
|
09/29/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :*/ 1) FINISH BATHROOM AND ITEM #2 PREVIOUS INSPECTION | |
09/21/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) PANEL LABELING TO BE PERMANENT NOT TAPE. 2) PLANS AND REVISIONS DO NOT REFLECT WORK INSTALLED 3) FILLER BLANK NEEDED FOR PANEL. OK TEMP C OF O SUBJECT TO DETERMINATION OF STEVE LONG | |
09/20/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) BOXES ARE MORE THAN 1/4" FROM BOX TO SURFACE TO USE APPROVED EXTENDER RING 370.20 2) FILL UNUSED OPENING IN BOXES 3) TIGHTEN LOOSE TERMINATIONS AT PANEL 4) WHERE IS REVISED PANEL SCHEDULE AND PLAN TO BE ON SITE 5) BATHROOM NOT FINISHED AND CUSTOMER OCCUPING SPACE WITH OUT C OF O OR TEMP C OF O |