Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T04CM03580
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) SOIL WATER TEST IS OK. 2) RED LINES HAVE BEEN MADE, WILL REQUIRE A REVISED & APPROVED. PLAN BY TIME OF FINAL INSPECTION. | |
05/24/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 909.0 NOTE TWO FIXTURES ON ISLAND SINK WASTE 2) PLEASE INSTALL AS PER APPROVED PLAN OR PROVIDE RED LINES-REVISED PLAN AT LATER DATE 3) BACK PITCH AT ? 4) WASHROOM UL MISSING AND LAV MISSING, PLEASE INSTALL AS PER PLAN 5) THIS IS NOT A COMPLETE INSPECTION 6) IF YOU MAKE RED LINES, I WILL NEED THEM ON THE JOB SITE ALONG WITH APPROVED REVISED PLAN AT TIME OF INSPECTION |
|
05/23/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE HAVE PLUMBER ON JOB AT TIME OF NEXT INSPECTION 2) NOBODY ON JOB AT THIS TIME ON MESSAGE |
|
05/19/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE HAVE ALL APPROVED PLUMBING PLANS ON SITE. INSTALL PER APPROVED PLAN. 2) DRY YOUR SOIL OUT AT FITTING AREAS TO PROVIDE CORRECT WATER TEST ON WASTE & VENT SYSTEM. 3) PROVIDE PROOF OF ?? ?? OF DEMO WASTE & VENT SYSTEM. |
|
05/19/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 3RD INSPECTION: PLEASE HAVE YOUR PLUMBER LOOK OVER PLAN AND INSTALL AS PER PLAN. PLEASE PROVIDE CLEANOUT AS PER PLAN AND PROVIDE SIZE OF VENT AS PER PLAN. PLEASE READ OVER 94 UPC SECTION 905.3 FOR VENTS INSTALLED LESS THAN 6" ABOVE FLOOD LEVEL RIM OF FIXTURE-SHALL BE INSTALLED WITH APPROVED DRAWINGS. FITTING REMOVE 1/4 BENDS. PROVIDE SWEEPS ALSO READ OVER SECTION 905.2 315.4 . ALSO PLEASE NOTE: WASTE PIPING SHALL BE LAID ON AFIRM BED-WE DO NOT BRIDGE ABS ON ANY OTHER WASTE LINES |
|
05/12/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NOT READY YOU NEED TO TALK WITH YOUR PLUMBER. NEW REVISED PLAN ON JOB AT THIS TIME PLUMBING IS NOT INSTALLED LIKE APPROVED REVISED. PLEASE HAVE PLUMBER PROVIDE ALL REVISION AS NEEDE. PLUMBER TO SEE ISOMETRIC. DRAWING FOR PROPER SIZE OF CO & VENT. PLUMBER PLEASE NOTE: IF YOUR ENGINEER SPECT OUT ON HIS PLAN TO INSTALL A 2" CO. & A 2" VENT PLEASE INSTALL AS PER PLAN . DO NOT INSTALL 1 1/2' | |
04/04/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* NOT INSTALLED AS PER APPROVED PLAN. PROVIDE APPROVED REVISED PLAN OR INSTALL AS PER APPROVED PLAN. |