Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE ( 2) BACKFLOW CERTIFICATIONS TURNED IN. | |
| 06/23/2005 | PLUMBING - FINAL | Not ready for Inspection | BACKFLOW INSTALLATION OK. 1) PROVIDE BACKFLOW CERTIFICATION FOR RP AT MAIN AND LANDSCAPING PRESSURE VACUUM BREAKER. 2) SECURE HANGING HEATER. RECEIVED LETTER FROM ARCHITECT OK. FOR T/M COPPER IN BUILDING. IVRS - Inspection :* | |
| 06/22/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) EXPOSE ALL PIPING AND CONNECTION @ METER THRU BACKFLOW PREVENTOR. 2) NO CLEAN OUT AT UTILITY SINK. 3) EXPANSION TANK NOT SUPPORTED. 4) REQUIRE TYPE "L" COPPER. 5) N/H BOND NOT APPROVED AT WC VENT. 6) USE APPROVED FITTING BETWEEN ABS/VENT. | |
| 05/27/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) GAS PRESSURE TEST IS OK 2) SHALL SEE FINAL CONNECTION TO SUSPENDED UNIT 3) OK FOR TEMP C OF O AS PER STEVE LONG |