Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/29/2004 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) EVAP COOLER NOT INSTALLED 2) POWER MUST BE ON FOR FINAL INSPECTION 3) 6" CLEARANCE REQUIRED AT WATER HEATER VENT OR "B" VENT REQUIRED | |
| 07/28/2004 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/27/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : INSTALL WIRING IN BASEBOARD HEATERS GAS PIPING NOT ALLOWED UNDER CONCRETE UNDER ADDITION REMOVE AND RETEST PIPING TO STOVE AND WATER HEATER STAIR RISE & RUN HANDRAIL GUARD RAIL NOT TO CODE REMOVE ALL UNUSED PLB PIPING NEED LICENSED ELEC CONTRACTOR TO CERTIFY ALL WORK BEING DONE ELECTRICALLY COMPLETE ALL PLB ELE GAS MECH AND RECALL MIN HEAD ROOM NOT MAINTAINED AT STUDIO CEILINGS AND STAIR HEAD ROOM CLEARANCE PRESSURIZE WATER PIPING INSTALL FLUE WATER HEATER & PTR TO EXTERIOR STOPPED INSPEC. |