Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/21/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 10/20/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/18/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/13/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/12/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) DRAIN AND WASTE LINES NOT SITTING ON FIRM BED, CHECK PITCH AND REMOVE LARGE ROCKS FROM TRENCHES AND SHADE PER 1994 UPC SEE 315.4 |
|
| 10/11/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NOTHING DONE FROM LAST INSPECTION 2) NEXT FAILURE WILL BE A RE-FEE |
|
| 10/08/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)NEGATIVE PITCH AT SEWER LINES |