Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/21/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 10/20/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) PARTIAL FOR HOUSE ONLY 2) TWO WAY CLEANOUT NOT IN 3) BWV REQUIRED 4) DO NOT DROP LUMBER UNTIL YOU HAVE A LIVE FIRE H/D | |
| 10/13/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection. Nothing done from last inspection |
|
| 10/12/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) 2" DRAIN LINE FROM KITCHEN NOT ON FIRM BED. REMOVE ALL ROCKS FROM TRENCHES (CANOE CALICHE) |
|
| 10/11/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/08/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)REVISE TO SHOW 1 1/2 VENT ADDED OR BUILD PER PLAN ASKING FOR AA VALVE 2)CHECK FOR POS PITCH |