Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/12/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CLEANOUT AT MASTER BATH 2) PROVIDE FLUE FOR FURNACE 3) PROVIDE PROTECTION AT TOP PLATE FOR ELECTRIC 4) A. BOLTS LOSSE THRU-OUT AND A.B. MISSINGAT BREAK 12" MINIMUM 5) FIREBLOCK AT MASTER BATH DBL WALL |
|
| 03/07/2005 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 01/24/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED PLAN/PERMIT ON SITE 2) NEXT INSPECTION IS EXTERIOR CLIP/SHEATHING AND ROOF NAILING 3) FRAME DOES NOT GET INSPECTED UNTIL ALL INTERMEDIATES PASS |