Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04CM03265

Parcel: 107123380


Addresses:

97 E LAGUNA ST #01

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
04/20/2005 ENGINEERING - FINAL Approved
04/08/2005 ENGINEERING - FINAL Denied C OF O DENIED AT THIS TIME DUE TO THE FOLLOWING INCOMPLETE ITEMS.
1) COMPLETE ALL SIDEWALK AS SHOWN ON THE APPROVED PLANS OR PROVIDE REVISED DRAWINGS APPROVED BY BOTH ENGINEERING AND ZONING ALLOWING REMOVED SECTIONS.
2) PROVIDE DRAINAGE GUTTERS ON THE FRONTS OF ALL BUILDINGS TO ENSURE THAT NO WATER IS DEPOSITED ONTO THE PEDESTRIAN SIDEWALKS.
3) MEET WITH THE ZONING DEPARTMENT AND HAVE THEM APPROVE THE EXISTING SCREEN WALL ON THE NORTH SIDE OF THE PROJECT. COMPLETE THE CONSTRUCTION OF ALL OTHER REMAINING PERIMETER WALL TO THE 5 FOOT HEIGHT AS SHOWN ON THE APPROVED PLANS.
4) PROVIDE A LETTER FROM THE SOLID WASTE DEPARTMENT SHOWNING THAT THEY HAVE APPROVED THE TRASH DUMPSTER AS IT IS NOTED AT THIS TIME. INSTALL THE GATES ON THE DUMPSTER AS DISCUSSED TODAY DURING THE FIELD INSPECTION.
5) COMPLETE ALL RIGHT-OF-WAY AREAS AS SHOWN ON THE APPROVED PLANS.
6) THE PAVEMENT FOR THIS SITE HAS NOT BEEN COMPLETED AT THIS TIME, THIS IS A REQUIREMENT PRIOR TO RELEASING ANY PORTION OF THIS SITE FOR TEMPORARY C OF O'S.