Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T04CM03162
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
10/01/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
09/30/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :*PARTIAL APPROVAL. 1) MISSINGBUSHING FOR BONDING ON A/C UNITS, 2)TIGHTEN BUSHINGS. HP,3,9,10 111,8,4,5, | |
09/28/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :*/OK TEMP C OF O - COMPLETE #6,, 8 & 9 BY 10-01-04 SUBJECT TO STEVE LONG | |
09/27/2004 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) ACCESS REQUIRED FOR ELECTRICAL-WATER COOLER PLATES 2) CONDUCTOR COLORS TO BE AS PER CITY AMENDMENTS 3) BOXES MORE THAN 1/4" FROM BOX TO SURFACE TO USE AN APPROVED EXTENDER RING-NON COMBUSTIBLE FLUSH WITH COMBUSTIBLES 4) BOXES TO BE GROUNDED NOT USING SHEET METAL THREAD SCREWS 5) BOND BUSHINGS FOR CONCENTRICS OVER 250 VOLTS 6) MAINTAIN WORKING CLEARANCE IN FRONT OF A/C 7) PLANS ARE STAMPED AFTER 7/1/04-WORK IS TO BE AS PER 2002 NEC 8) COVERS ON ROOF TO BE WEATHER PROOF OR NOT PLUGED IN 406.8 9) A/C DISCONNECTS NOT ALLOWED ON ACCESSIBLE PANELS 440.14 | |
09/13/2004 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :*/1)FINISH ELECTRIC? SUBJECT TO STEVE LONG FOR STOCKING |