Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (1) IN HOUSE BACKFLOW CERTIFICATION FOR ICE MACHINE. |
|
| 03/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NEW ICE MACHINE IN TRAINING ROOM SHALL REQUIRE PROOF OF 1" AIR GAP OR CORRECT BACKFLOW PROTECTION WITH CERTIFICATION FOR WATER SUPPLY. 2. DRAINS FROM ICE MACHINE & FILTER TO BE SEPARATE GRAVITY DRAIN WITH 1" AIR GAP AT FLOOR SINK AND BE PROPERLY SUPPORTED. THESE ITEMS FOR FINAL ITEMS FROM 2/7/06 OK |
|
| 02/07/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. HAVE HYDRO THERAPY TUBS INSTALLED. 2. PROVIDE CORRECT CRITICAL LEVEL FOR BOYS LOCKER ROOM STOOL FLUSH VALVE. 3. PROVIDE COPY OF STATE BOILER INSPECTION APPROVAL 4. PROVIDE CLEANOUT FLUE & COVER, ACROSS PANEL IN BOILER ROOM. 5. INSTALL CHECK VALVES & VALVE PER DETAIL 6 ON 4 P 2.2 6. TEMP C OF O ONLY IF BACTERIA REPORT IS APPROVED FOR BUILDING WATER. |
|
| 10/27/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*CLOSET FLANGES IN GANG RESTROOM OF MAIN CORRIDOR. OK |