Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
04/14/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
RECEIVED (1) IN HOUSE BACKFLOW CERTIFICATION FOR ICE MACHINE.
03/31/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. NEW ICE MACHINE IN TRAINING ROOM SHALL REQUIRE PROOF OF 1" AIR GAP OR CORRECT BACKFLOW PROTECTION WITH CERTIFICATION FOR WATER SUPPLY.
2. DRAINS FROM ICE MACHINE & FILTER TO BE SEPARATE GRAVITY DRAIN WITH 1" AIR GAP AT FLOOR SINK AND BE PROPERLY SUPPORTED.
THESE ITEMS FOR FINAL ITEMS FROM 2/7/06 OK
02/07/2006 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1. HAVE HYDRO THERAPY TUBS INSTALLED.
2. PROVIDE CORRECT CRITICAL LEVEL FOR BOYS LOCKER ROOM STOOL FLUSH VALVE.
3. PROVIDE COPY OF STATE BOILER INSPECTION APPROVAL
4. PROVIDE CLEANOUT FLUE & COVER, ACROSS PANEL IN BOILER ROOM.
5. INSTALL CHECK VALVES & VALVE PER DETAIL 6 ON 4 P 2.2
6. TEMP C OF O ONLY IF BACTERIA REPORT IS APPROVED FOR BUILDING WATER.
10/27/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*CLOSET FLANGES IN GANG RESTROOM OF MAIN CORRIDOR. OK