Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit: T04CM03049

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
10/11/2004 FRAMING Approved IVRS - Inspection :*
09/29/2004 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) 1, 2, 3, 8 AND 9 NOT READY
09/28/2004 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) DRYER VENT RUN TOO LONG 2) FIREBLOCK HALLWAY MINI CAN AREA 3) INSTALL HOLDOWNS 4) SHIM HEADERS WHERE NEEDED 5) SEAL ALL OPENINGS FROM 1ST TO 2ND FLOOR 6) SEAL OPENING AND REPAIR FRAME AT 2ND FLOOR CEILING AROUND 1ST FLOOR FURNACE FLUE 7) PROVIDE 1" CLEARANCE TO WATER HEATER FLUE 8) CORRECT HVAC LINE RUN IN MASTER CLOSET 9) GET ENGINEERS FIX ON WALK DECK LEDGER ATTACHEMENT