Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/25/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) COMPLY WITH SD-2(6) 8D'S AT 3" ON CENTER 2) HAVE ENGINEER OF RECORD JUSTIFY AND APPROVE HOLDOWN AT N.E. CORNER 3) NAIL SD-4(11) AT 4" ON CNETER WITH 16D'S OR INSTALL PER PLAN 4) GROUND ALL LIGHT J-BOXES 5) USE 2 X 4 FRAME TO SUPPORT AB'S TO 2ND FLOOR PLUMBERS TAPE NOT ALLOWED TO CARRY LOAD 6) LAV ABS WASTE PENETRATED WITH LATH STAPLE, 2ND FLOOR MASTER BATH 7) STOPPED INSPECTION |