Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2005 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* |
| 03/21/2005 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :* WATER TEST WASTE & VENT THRU ROOF OK. 1) FLOOR CLEANOUTS WILL REQUIRE ?? PATTERN CLEANOUTS COVERS. 2) NEED TO SEE PIPE WRAPS PRIOR TO CONCRETE POUR BACK. 3) COFFE, SODA, ICE MACHINE MAY REQUIRE BACKFLOW PROTECTION FOR FINAL. SEE NOTE # 5 P-1 |
| 03/16/2005 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) FLOOR SINK REQUIRES APPROVED TRANSITION COUPLING FOR ABS TO CAST IRON. ( NO HUB COUPLING IS NOT) 2) PROVIDE TRANSITION COUPLING AT 4" BUILDING DRAIN CONNECTOR TO NEW ABS. 3) P-4 FIXTURE MAY REQUIRE 1 1/2 DRAIN ARM( 2X2X1/1/2 SANTEE) IF TAILPIECE OF FIXTURE IS 1 1/4" |
| 03/14/2005 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) PIPE TO PITCH AT 1/4" PER FOOT. 2) VENT DOWNSTREAM OF TRAP. 3) VENT TO RISE VERTICALLY. 4) USE APPROVED STRAP. 5) PROVIDE FOR INSULATION 6) CLEAN OUT YARDWATER TRENCH AND RECALL FOR INSPECTION. |