Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 02/16/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) LEDGER BOLTS LOOSE 2) HAVE PLAN REVISED FOR USE OF CORRIGATED STAINLESS STEEL TUBING AND SIZED ACCORDINGLY 3) LPI JOISTS HAVE OVERSIZE HOLES TO CLOSE TO BEARING END 4) FIRE STOP 2ND FLOOR PENETRATIONS 5) FURNACE "B" VENT HORIZONTAL RUN MUST HAVE 1/4" FT PITCH 6) PROVIDE PEX PROTECTION 7) HORIZONTAL DWV REQUIRES 1/4" FT PITCH 8) STAIRS NOT IN 9) WIRING NOT COMPLETE 10) GAS PRESSURE TEST OK |