Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2005 | ROOF NAILING | Approved | IVRS - Inspection :*APPROVED | |
| 12/14/2005 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999*NEED TO USE SIMPSON ST 292 STRAPS @ 2X BLOCKING PER DETAIL 2 ON SHEET S5.O( NOTE 7) IF A DIFFERENT STRAP USED THEN DOCUMENTATION IS REQUIRED TO SHOW EQUIVALENT ???& STAMPED LETTER FROM ENGINEER REMOVE ROOF CRI?? TO VERIFY EAGLE NAILING |
|
| 12/13/2005 | ROOF NAILING | Cancelled | IVRS - RI canceled | |
| 12/09/2005 | ROOF NAILING | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE STRUCTURAL ROOF PLANS AND APPROVED TRUSS DRAWINGS 2) SITE TRAILER LOCKED 2:40 PM |