Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/21/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 02/01/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* 1) NOT INSTALLED PER PLAN NO REDLINES ON SITE. 2) PROVIDE ACCURATE ISOMETRIC DRAWING, SHOWING DEVELOPED LENGHT AND TOTAL BTU CONSUPTION. IF DRAWING IS REDLINED ON PLAN, IT WILL BE SUBJECT TO THE REVISED APPROVED PLAN. 3) WORK COVERED WITHOUT INSPECTION INCLUDES PAINTED PAINTED PIPE WHICH OBSCURES THE LISTING. |