Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/03/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) MUST ADDRESS ITEMS #4 FROM PREVIOUS INSPECTION 2) COMPLETELY; LEAVE OPEN AREA (HALL BATH PLBG) 3) OK TO INSULATE ALL OTHER AREAS | |
| 09/02/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/01/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) FIRE BLOCK AROUND WATER HEATER PLENIUM 2) PROVIDE STUD SHOE AT OVER BOARD KINGS AT KITCHEN WINDOW 3) HOLDOWN AT MASTER BATH NOT ON TWO KING STUDS 4) EXPOSE UNDERGROUND PLUMBING FIX AT HALL BATH AND PROVIDE ENGINEERING FIX FOR JACK HAMMERED POST TENSION SLAB AND APPROVED BY CITY OF TUCSON |
|
| 08/24/2004 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* |