Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM02739
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2006 | ENGINEERING - FINAL | Approved | Project complete, OK to release bond | |
08/11/2005 | ENGINEERING - FINAL | Correction Required | 1. PROVIDE 8' SIDEWALK ON NORTH SIDE OF BUILDING AND VERIFY 24' PAAL AT DRIVEWAY WITH 18' PARKING SPACES. SEE TENTATIVE PLAT/DEVELOPMENT PLAN, LRE SPECIAL EXCEPTION CONDITION, NOTE 10, PAGE DP1. 2. COMPLETE CONSTRUCTION AND STABILIZATION OF BASIN #7 INCLUDING THE INLET AND OUTLET STRUCTURES. 3. PROVIDE EROSION CONTROL STABILIZATION WHERE THE ROOF DRAIN DOWNSPOUTS HAVE CAUSED EROSION ON THE WEST SIDE OF THE BUILDING. 4. PROVIDE SIDEWALK AT SOUTHEAST CORNER OF BUILDING TO CONNECT BICYCLE PARKING TO 8' SIDEWALK. 5. STRIPE PEDESTRIAN WALKWAYS ACROSS DRIVEWAYS AT NORTHEAST AND SOUTHEAST CORNERS OF SITE. 6. PROVIDE (2) CLASS I BICYCLE PARKING ENCLOSURES AT NORTHWEST CORNER OF BUILDING. |
|
11/23/2004 | ENGINEERING - FINAL | Approved | TEMPOARY C OF O. FINAL C OF O NOT TO BE ISSUED UNTIL A FINAL GRADING INSPECTION HAS BEEN REQUESTED AND APPROVED. |