Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T04CM02682
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2008 | BUILDING - FINAL | Approved | ||
06/07/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* OK TCO ALL 3 FLOORS 1. WE WILL NEED SIGNAGE IN EACH UNIT @ DRYER VENT TO INDICATE LENGTH OF VENT. VERBAGE TO INDICATE 40' MIN. FOR GARDEN LEVEL AND 80' MIN. FOR GRADE & TOP FLOOR. 2. ALL RATED GLASS TO BE INSTALLED BEFORE FINAL. 3. BUILD INSPECTOR MUST HAVE ACCESS TO ALL OCCUPIED ROOMS FOR FINAL. 4. SEE #4 AND #8 ABOVE FOR FINAL. 5. HAVE ALL REVISED APPROVED PLANS FOR FINAL. 6. TRUNCATED DOMES |
|
05/19/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* OK TCO GARDEN & GROUND LEVEL 1000-1199 1. ACCESS PANEL IN LAUNDRY AREA. 2. PLUG DEAD LOCK OPENING BASEMENT DOOR WEST. 3. THRESHOLDS TO BE SEALED @ EDGES & BOTTOM. 4. WEATHERPROOFING EXIT DOORS & WINDOWS. 5. ALL REGISTERS MUST BE ON. 6. SPRINKLER HEADS MUST BE UNCOVERED. 7. 4" MAX WIDTH OF GUARDS @ SOUTH PLATFORM 8. PLUG IN WH ROOM A75 |
|
05/05/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. 1HOUR ASSEMBLY (DOORS) SEPARATING GARDEN LEVEL IS NOT DONE. 2. SMOKE SEALS IN GARDEN LEVEL INCOMPLETE. 3. DOORS MUST BE READY PER APPEAL. SMOKE SEALS MUST BE IN PLACE. 4. SAFETY GLAZING MUST BE IN PLACE. * DOOR ASSEMBLIES DO NOT MEET REQUIREMENTS OF APPEAL FOR SMOKE SEALS AND 20 MINUTE ASSEMBLY. APPEAL CALLS FOR 3/4 "PLYWOOD AT TRANSOMS - THIS IS NOT CASE FOR ALL DOORS". - SMOKE SEALS INCOMPLETE OR INCORRECT PLEASE PROVIDE MANUFACTURER INFORMATION FOR SWEEPS. - GLAZING FOR HAZARDOUS AREAS NOT COMPLETE. - INSPECTION STOPPED PLUMB & MECH INSPECTIONS NOT DONE BECAUSE BUILDING NOT READY. |
|
04/28/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1. 20 MINUTE DOOR ASSEMBLIES REQUIRED. 2. STAIR GUARDS TO BE 42" @ NEW STAIRS. 3. SURFACE MOUNTED LATCHES/THROW BOLTS NOT ALLOWED AT EXITS. 4. REPAIR FIRE SEPARATION WALL/CEILING AT BASEMENT LAUNDRY AREA. 5. SAFETY GLAZING REQUIRED @ DOORS AND WITHIN 2' OF SIDES OF DOORS. 6. FIRE RATED GLASS REQUIRED GARDEN LEVEL 1 HOUR ENCLOSURES. 7. WEATHER STRIPPING REQUIRED @ GARDEN LEVEL EXTERIOR WINDOWS TO PREVENT FLOODING. 8. COVER FLOOR DRAIN ROOM 1005 9. CAULK TUBS @ FLOOR AND TOILETS @ FLOOR. 10. WHAT ABOUT ANTI-TILT FOR STOVES? 11. FINISH NORTH BASEMENT HALL AREA. 12. HANDRAILS OUT OF GARDEN LEVEL MISSING. 13. ALL ELEC. PANELS & COVERS MUST BE IN PLACE. 14. 4" MAX BETWEEN GUARD AND POST AT SOUTH EXTERIOR STAIR. 15. #1208 CLEANOUT EXTENSION AND WALL REPAIR @ LAUNDRY. 16. #1202 NE WINDOW SEAL INSUFFICIENT. 17. FIRE RATED GLASS FOR WINDOWS ROOM 1205 18. DOOR STOPS NOT ALLOWED ON SELF CLOSING DOORS. 19. INSULATE ATTIC. 20. PROVIDE PLUMBING FINAL. 21. PROVIDE DOCUMENTATION ACCEPTABLE TO BUILDING OFFICIAL FOR DRYER REQUIREMENTS (ALL 25 UNITS). 22. PROVIDE FIRE INSPECTION FINAL. |
|
04/06/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* | |
03/31/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1. ALL PROGRESS GOOD 2. 3RD FLOOR I NEED PLUMBING, MECH, ELECTRIC & FIRE FINALS. IF APPROVED PLANS FOLLOWED THEN I PROJECT 1 DAY COMPLETION AFTER TEP CONNECTS POWER. THIS DOES NOT ADDRESS ISSUE OF LOW GUARD @ CENTER STAIR. 3. 2ND (MAIN FLOOR) CORRIDORS ONLY REQUIRES ELECTRIC FINAL, BLDG. FINAL, FIRE FINAL AND APPEAL FOR STAIR GUARDS 39" HIGH. ESTIMATED TIME FOR 100% ROOMS & HALLS 5 DAYS TO COMPLETION. 4. GARDEN LEVEL STILL REQUIRES WIRING, PLUMB FIXTURES, CABINETS AND INSPECTIONS. CORRIDOR COMPLETION 5 DAYS. 100% WITH ALL ROOMS 8 DAYS. |
|
03/24/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* | |
03/10/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* GUARD RAIL 31 1/2 - 32"? |