Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/26/2005 |
ENGINEERING - FINAL |
|
Approved |
|
| 09/21/2005 |
ENGINEERING - FINAL |
|
Partial Approval |
NO CORRECTIONS HAVE BEEN MADE TO THE ROOF DRAINS ADDED DURING CONSTRUCTION. ENSURE ROOF DRAINS DIRECT THE WATER AWAY FROM THE REAR OF THE BLDG, TO PREVENT PONDING BEHIND THE RESTURANT. CALL FOR RE-INSPECTION |
| 02/10/2005 |
ENGINEERING - FINAL |
|
Partial Approval |
Temporary C of O given. Approved C of O will be issued upon completion and inspection of roof drainage repairs. Call for re-inspection. |