Permit: T04CM02594

Parcel: 113092650


Addresses:

1109 E SILVER ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
06/23/2004 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
06/15/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) EXPOSE FOOTING AT EAST SIDE TO VERIFY SRE 2) OPEN EAST SIDE WALL TO VERIFY 1 HR. FIRE WALL CONSTRUCTION 3) DOUBLE 2 X 8 BEAM IS NOT ADEQUATE TO SUPPORT ROOF 4) 4 X 6 BEAM IS NOT ADEQUATE TO SUPPORT END OF DOUBLE 2 X 8 BEAM 5) OBTAIN WASTE WATER PERMIT FOR ALL PLUMBING INSTALLED 6) PROVIDE GAS PRESSURE TEST ON GAS LINE 7) GAS VALVE MUST BE ATTACHED TO APPLIANCE OR CAPPED
06/14/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*