Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/ 1) SOIL WATER TEST IS OK 2) P.O.C. OF NEW BLDG DRAIN TO EXISTING BLDG DRAIN IS OK 3) ALL CORRECTIONS HAVE BEEN MADE 4) OK TO BACKFILL TRENCH | |
| 07/08/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST REMOVE FERNCO COUPLING AND PROVIDE A SPECIALTY COUPLING THIS COUPLING IS SHIELDED 2) MUST PROVIDE A 10' HEAD OF WATER TEST ON WASTE AND VENT SYSTEM THAT IS NEW ONLY 3) MUST SILVER BRAZE AL JOINTS UNDERSLAB |