Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04CM02523

Parcel: 118051220

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
07/20/2004 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
07/19/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) MAINTAIN MINIMUM 3" CLEARANCE REBAR TO DIRT 2) WRAP ALL PLUMBING PIPING IN CONTACT WITH CONCRETE 3) UFER NOT INSTALLED 4) TIE UP HOLDOWNS AND SECURE IN PLACE 5) SET PROPERTY PINS AND PULL STRING LINES TO CHECK SETBACKS 6) UNCOVER SEWER LINE CONNECTION TO MAIN 7) HAVE PIMA COUNTY WASTE MGT REPAIR DETAIL ON SITE 8) NEED VERIFICATION OF 03005 APPROVAL (ALREADY BACKFILLED). STOPPED INSPECTION