Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: SIGN - FINAL
Permit Number - T04CM02488
Inspection Description - SIGN - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/09/2004 | SIGN - FINAL | Not ready for Inspection | IVRS - Inspection :* STILL NEED ELEC FINAL ON SIGN | |
07/07/2004 | SIGN - FINAL | Denied | IVRS - Inspection : STILL NEEDING ELEC FINAL ON SIGNS The occupancy inspection reveals that corrections are required. Please furni |
|
06/28/2004 | SIGN - FINAL | Denied | IVRS - Inspection : NEED CHANGE OF SIGN INSTALLED ON NORTH END WINDOW; STILL NEED TO HAVE ELEC FINAL ON SIGN AND REFEE DUE BEFORE NEXT INSP.A reinspection fee has been assessed for this inspection. Multiple inspectio | |
06/10/2004 | SIGN - FINAL | Denied | IVRS - Inspection : ALL WINDOW SIGNS REQ PERMITS OR REMOVAL; FINAL T04OT00912 FOR ELEC INSP FOR C/O The occupancy inspection reveals that corrections are required. Please furni |