| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* APPROVED | |
| 01/10/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 3" ABS SITE FROM SUMP TEST OK 2) PLEASE NOTE CONFLICT ON PLAN-P22.2 CALLS FOR 3" DISPOSAL 3) PLAN CALLS FOR 4" ? |
|
| 12/30/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | NOT READY - NOT INSTALLED PER PLAN - PLAN CALLS FOR 4" SDR 35 INSTALLED IS 3" ABS AT OUTLET OF SEPARATOR. | |
| 12/27/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/TEST OK ON SITE SEWER FROM BLDG TO SEPTIC TANK SUBJECT TO APPROVED REVISED PLANS | |
| 12/22/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/PLEASE NOTE PERMIT FOR SEPTIC SYSTEM FROM PCDEQ PERMIT #P04CP09494 INSPECTED BY OTHERS | |
| 12/20/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/SAND OIL LINE TO TANK & PARTIAL ON WASTE LINE STUB OUT OF BLD H TEST OK SUBJECT TO APPROVED REVISED PLANS RED LINES ON JOB SEE P1.1 | |
| 12/10/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ROOM 130-PARTIAL ON TRENCH DRAIN. PLEASE PROVIDE APPROVED REVISED PLAN BEFOR APPROVAL IS GIVEN. ALSO 1 1/2 TO WASH RACK TEST OK. OK TO BACKFILL | |
| 12/06/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) RED LINES ON JOB REROUTE OF WASTE LINE ROOM 129 TRAPS AND VENTS REMOVED ? P-12 2) AIR TEST OK AT THIS TIME PLEASE PROVIDE APPROVED REVISED PLAN BEFORE APPROVED IS GIVEN |
|
| 12/01/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/PLEASE SEE SEC 1008.2 "NO WASTE FROM OTHER FIXTURES" OIL & SAND SEPERATORS. VENTS UNDERGROUND FOR P-12 ONLY. AT THIS TIME UNABLE TO COMPLETE INSPECTION. WILL NEED TO TALK WITH PLANS EXAMINER ABOUT OTHER FIXTURES TO SEPARATOR & TRAPS & VENTS AT P-12. IF YOU COVER YOU COVER AT YOUR OWN RISK |
|
| 10/26/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/06/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/1)RMS #112 & #113 DBL SANTEE INSTALLED OK. 3" AT SINK OK. OK TO COVER THIS AREA. | |
| 10/05/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/TEST OK. OK TO COVER OTHER? AREA-SEE PLIL? - CHANGE DOUBLE WYE'S & CALL FOR INSP-SEC 3" CO AT K SINK |