Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/06/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) 3 PLY TRUSS NOT REPAIRED PER DETAIL 2) LEAVE REPAIR AREA OPEN | |
| 10/05/2004 | FRAMING | Denied | IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspection. Nothing done |
|
| 10/04/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) PENDING 3 PLY GIRDER REPAIR 2) OK TO START ROCK | |
| 09/30/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) GAS TEST AT 2 PSI 2) NO PLAN/PERMIT ON SITE, 10 PSI REQUIRED 3) REFEE IMPOSED |
|
| 09/23/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PROVIDE 1" CLEARANCE FROM B-VENTS TO COMBUSTIBLES 2) REPAIR SHEAR AT MASTER BATH 3) PROVIDE CITY OF TUCSON APPROVED DETAIL FOR BIB TRUSS REPAIR 4) DO NOT SHEET ROCK 5) PARTIAL FRAMING PLAN DETAIL CALLS FOR 2 X 6 CEILING JOISTS AT 16 ON CENTER AND 2 X 8 OVER TOP OF TRUSS |
|
| 09/09/2004 | FRAMING | Cancelled | IVRS - Ri canceled | |
| 09/08/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/07/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) FRONT GIRDER DETAIL NOT PER PLAN 2) NO TEST ON DWV'S 3) 'O' PSI GAS TEST 4) REPAIR SHEER AT BATH 5) BIB TRIPPLE DRILLED THROUGH BOTTOM CHORDS 6) STOPPED INSPECTION |