Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/19/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* WATER TO BE ON TO ALL FIXTURES 1. ALL HOSE BIBS TO HAVE VACUUM BREAKERS WITH TAMPER SCREWS BROKEN OFF. 2. P-TRAPS TO BE INSTALLED CORRECTLY AT LAVS WITH CORRECT DRAIN TAILPIECES. 3. PROVIDE CORRECT DRAINAGE FOR WASHING MACHINE 4. ALL PIPING IN LAUNDRY ROOM TO BE PROPERLY SECURED 5. YOUR GAS SYSTEM IS EXTREMELY UNDERSIZED FOR 240,000 TOTAL DEMAND. PROVIDE CITY APPROVED GAS ISOMETRIC WITH INSTALLATION TO MEET DEMAND. THIS SYSTEM SHALL MEET 2003 UPC REQUIREMENTS WITH TEST ON GAS SYSTEM. |
|
| 06/26/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NO PLUMBING PLAN - ONLY NOTES ON A.1 2. DEMO'D PIPING COVERED WITHOUT INSPECTION. 3. NONE OF THE WATER CLOSETS HAS CENTER TO SIDEWALK CLEARANCE. 4. PVC WATER REPLACED WITH COPPER OK ALL EXPOSED EXTERIOR COPPER TO BE INSULATED IN AN APPROVED MANNER. 5. HOSE BIBBS REQUIRE A.V.B'S |
|
| 06/07/2006 | PLUMBING - FINAL | Denied | 1. PVC PIPE IS NOT APPROVED FOR WATER INSIDE BUILDINGS OR IN EXPOSED LOCATIONS 2. BACKFLOW REQUIRED FOR HOSE BIBBS. |
|
| 06/02/2006 | PLUMBING - FINAL | Denied | 1. KITCHENS DEMO'D CAPPED OFF BEHIND WALL W/O INSPECTION. 2. GAS PRESSURE TEST OK BLDG. INSPECTOR TO LEAVE GAS CARD 3. PLUMBING FINAL OK -- OK FOR C OF O S.T.O.I -------------------------------------------------------------------------------------------------PLUMBING APPROVAL RETRACTED PER L. HANLY DUE TO ISSUES WITH STRUCTURAL PART OF INSPECTIONS |
|
| 09/07/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |