Permit: T04CM02372

Parcel: 124041020


Addresses:

943 E UNIVERSITY BL


Inspection Status: Approved

Inspection History: PLUMBING - ROOF DRAINS

Permit Number - T04CM02372

Inspection Description - PLUMBING - ROOF DRAINS

Inspection Status - Approved

Date Description Inspector Results Comments
08/25/2006 PLUMBING - ROOF DRAINS Approved
08/17/2006 PLUMBING - ROOF DRAINS Not ready for Inspection HAVE REVISED APPROVED PLAN READILY AVAILABLE AT TIME OF INSPECTION.
ACCESS TO OVERFLOW CONNECTION IN MASONRY WALL BLOCKED BY DOUBLE ROW OF METAL STUDS.
05/25/2006 PLUMBING - ROOF DRAINS Not ready for Inspection IVRS - Inspection :*
HOSE BIBS REQUIRE ABS'S
LAVATORIES REQUIRE FAUCETS
CUTDOWN ALL CLEAN-OUTS
PROVIDE APPROVAL PLAN
FINISH ROOF DRAINS/AREA DRAINS
05/23/2006 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*
1. AREA DRAIN NORTHSIDE, BETWEEN BLDGS
OK TO COVER - UP TO STAIRWELL.
2. TRAILER LOCKED
UNABLE TO LOCATE G.C
05/04/2006 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*
2 RAINWATER LEADERS ALONG WESTSIDE OF BLDG. INSTALLED UNDERGROUND FROM CURB TO 60' THIS REQUIRES APPROVED PLAN -- CONTRACTOR TO REDLINE ANY CHANGES TO THE PLAN.
04/20/2006 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*
1. ROOF DRAINS ALONG EAST SIDE OK TO COVER.
2. REMAINING GREASE TRAP OK TO COVER.
03/15/2006 PLUMBING - ROOF DRAINS Not ready for Inspection IVRS - Inspection :*
03/08/2006 PLUMBING - ROOF DRAINS Partial Approval 1. RWL'S ALONG WESTSIDE CONNECTED OK
OK TO COVER
03/03/2006 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*
1. RAIN LEADERS (2) FROM BLDG TO STORM DRAIN OK TO COVER
NEED TO SEE CONNECTION AT BUILDING
02/15/2006 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*3" RWL ON EAST CORNER, 6" RWL ON SOUTH WALL AT COL # 5, 4, 8 WATER TEST OK PIPING NEEDS TO BE SUPPORTED ON VERTICAL AND HORIZONTAL
PROVIDE WATER TEST ON WASTE & VENT
USE OF PROPER DRAINAGE FITTINGS REQUIRED AT HORIZONTAL TO HORIZONTAL CHANGE OF DIRECTIONS
ABS TO BE SUPPORTED AT 4" ON HORIZONTAL AND SECURE RISERS
PROVIDE 100 PSI TEST ON WATER, PROTECT COPPER FROM METAL SECURE COPPER IN WALLS
11/23/2005 PLUMBING - ROOF DRAINS Partial Approval IVRS - Inspection :*ROOF DRAINS IN CONCRETE OK TO COVER
TEST OK
WILL RETEST AT A LATER DATE