Permit: T04CM02372

Parcel: 124041020


Addresses:

943 E UNIVERSITY BL

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
02/22/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
1. CORRECTIONS MADE OK
2. ABS VTR WATER TEST OK
3. COPPER WATER TEST OK
4. CLOSET FLANGES OK
5. ROOF DRAINS OK
6. OK TO COVER WALLS
02/17/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
PLAN APPROVED BY WILDAN AND ENGINEERED BY SMU SHOWS 2-2" METERS AND RBS SUPPLYING A 4" WATER MAIN
- THE 4" MAIN IS CALCULATED AT 6FT/SEC
- PROVIDE ENGINEERING TO SHOW THAT THE 2" RPS AND 2" PIPING AT RPS WILL NOT EXCEED THE MAX 8FT/SEC VELOCITY ALLOWED BY CODE.
- 100 PSI TEST ON WATER PIPING ALL EXCEPT HB AT COL L.2. SECURES PIPING AT TOILET RM 119
- DWV WATER TEST PIPING THRU ROOF AT TR 117&118 OK
02/15/2006 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
01/06/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
10/24/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*CONTRACTOR REDLINED A REVISION TO THE PLAN ADDING A MOP SINK AND AN AUTOMATIC WASHER. OK TO COVER- SUBJECT TO REVISED APPROVED PLAN
10/10/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*UNDERGROUND INSIDE THE BLDG COMPLETE.