Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T04CM02372
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2006 | ELECTRIC - FINAL | Approved | ||
08/11/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* NEED TO COMPLETE EXTERIOR LIGHTING CALL IN PUMP INSPECTION NEXT TIME WITH THIS INSPECTION |
|
08/07/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. FINISH ALL WIRING PER PLAN - HAVE SEVERAL LOCATIONS WITH OPEN/INCOMPLETE WIRING. A/C UNITS NOT PROPERLY IDENTIFIED, INCORRECT FUSE SIZES FOR UNIT "G" AC PANEL DIRECTORIES NOT MARKED, OPEN BREAKER SPACES EXTERIOR LIGHTING NOT WORKING PROPERLY, SIGN CKT'S NOT PULLED -- FINISH TRIM ALL WIRING PER PLAN, HAVE ALL PANELS OPEN FOR INSPECTION. VERIFY WITH ARCHITECT WHY THERE IS NOT INTERIOR EMERGENCY LIGHTING ON SOME UNITS -- PROVIDE LETTER. |
|
08/02/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE ALL WORK BEFORE FINAL WORK STILL IN PROGRESS |
|
05/19/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. GAS, WATER, SPRINKLER PIPES MUST BE BONDED PER NEC 250.104 2. BUILDING STEEL NEEDS BONDED PER NEC 250.104 3. TEP POWER HAS BEEN HELD -- CALL FOR INSPECTION. 4. MAKE SURE ADDRESS AND UNIT NUMBERS ARE CORRECT. |