Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/16/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) CONVENTIONAL VENTING MUST BE TAKEN OFF THE TOP OF A HORIZONTAL TO VERTICAL CHANGE IN DIRECTION 2) FLAT VENTING IS ONLY PERMITTED WHERE REQUIRED BY STRUCTURE CONDITIONS AND MUST BE TAKEN OFF ABOVE CENTER LINE OF PIPE 3) HORIZONTAL WET VENT NOT PERMITTED 4) WATER TEST IS REQUIRED ON DWV SYSTEM TO 10' HEIGHT |