Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04CM02323

Parcel: 111061090

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
06/21/2004 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
06/16/2004 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) CONVENTIONAL VENTING MUST BE TAKEN OFF THE TOP OF A HORIZONTAL TO VERTICAL CHANGE IN DIRECTION 2) FLAT VENTING IS ONLY PERMITTED WHERE REQUIRED BY STRUCTURE CONDITIONS AND MUST BE TAKEN OFF ABOVE CENTER LINE OF PIPE 3) HORIZONTAL WET VENT NOT PERMITTED 4) WATER TEST IS REQUIRED ON DWV SYSTEM TO 10' HEIGHT