Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2008 | FRAMING | Approved | reference approval of sheet rock by original framing inspector RCamacho in following days. The majority of intermediate corrections had to do with nail plates and bonding...electrical and plumbing intermediates were approved. | |
| 05/11/2006 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PENDING ECH INFO 2) GATES LOCKED-NO ONE HOME 3) NO ANSWER AT DOOR 4) PROVIDE 1" CLEARANCE AT WATER HEATER FLUE FROM COMBUSTIBLES 5) PROVIDE HI/LO COMBUSTION AT WATER HEATER 6) OK TO INSULATE 7) EXPOSE WATER HEATER |
|
| 03/04/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE GAS AND COPPER BONDS 2) NAIL PROTECT KITCHEN 3) PROVIDE WATER TEST DWV SYSTEM COPPER OK 4) REMOVE EXISTING WIRING NOT TO BE USED 5) INSTALL W/H FLU 6) CLIP H2.5 EXISTING KITCHEN NORTH WALL 7) NAIL PROTECT REFRIDGERATOR SUPPLY 8) NAIL PROTECT HOME RUNS 9) NAIL PROTECT LAUNDRY ABS 10) NAIL PROTECT ABS AND COPPER THROUGHOUT 11) SECURE ALL 90 VENTS THROUGH ROOF 12) COMPLETE PONY WALL WATER CLOSET ROOM 13) COMPLETE FRAMING MASTER BATH AND ELECTRICAL 14) EXHAUST FAN NEEDED MASTER BATH 15) REPLACE DAMAGED CEILING JOISTS THROUGHOUT |
|
| 03/02/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE LEGIABLE DRAWINGS |
|
| 03/01/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 06/20/2005 | FRAMING | Partial Approval | IVRS - Inspection :* | |
| 06/16/2005 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NEED BETTER LEGIABLE SET OF PLANS 2) COMPLETE ALL WORK RECALL |